How Much Do Architects Charge in Melbourne? Fees, Stages and What's Not Included
8 November 2026 · 12 min read
At the end of a free consultation call this year, a homeowner planning a rear addition to her 1940s weatherboard asked me something I wish more people asked straight out: "Can you include your fees, and what I could expect to pay, in the follow-up?"
Of course. But it made me realise how hard that information is to find. Every project is different, but the way fees work isn't a mystery, so here it is, including what we actually charge, from a first consultation through to full service.
There's no official fee scale
There's no set price list for architects in Australia. Online cost guides quote anything from about 5% to 18% of the construction cost, which mostly tells you how wide the range is. Fees depend on the size and complexity of the job and how much of the work the architect is doing.
What is fixed in Victoria is how you have to be told. Under the Victorian Architects Code of Professional Conduct, which was updated this year, an architect can't start work on your project or charge you a fee until there's a written, signed client–architect agreement. For agreements made since 26 April 2026, that agreement must spell out:
- how the fees will be calculated, and how they'll be paid
- the circumstances in which fees could go up
- how a change to the services will affect the fee
- reasonable estimates of disbursements, where possible
- how either of you can end the agreement
The architect also has to give you the agreement at least seven business days before asking you to sign (you can choose to sign sooner), and for a house it comes with the ARBV's Working with an Architect checklist. If someone asks you to sign on the spot, that's worth noticing.
The three ways architects charge
A percentage of the construction cost
The fee is a percentage of what the build costs. It's simple and scales with the project. The catch is that every upgrade or price increase also increases what you pay the architect. That's not bad faith, but it's worth knowing.
A fixed fee for each stage
The fee is a set amount for each stage of the work, agreed upfront against a defined scope. This is how we work. Our agreement records an estimated cost of works, and our fees are fixed against it. If the builder's price comes in higher, our fee doesn't follow; it only changes if the scope does. Our fees are quoted including GST, so you can see exactly what the work costs.
The exception is contract administration, the stage while your house is being built. We charge that as a monthly rate until practical completion, because how long construction takes is up to the builder, not us. Your fee proposal includes an estimate for it, so the total is clear from the start.
Time-based (hourly)
You pay for the hours spent. It suits small, open-ended jobs like a one-off investigation, but makes a whole project hard to predict. Some tasks within a project suit an hourly rate too, such as responding to council's requests for further information on a planning application, because nobody knows beforehand how much work that will be.
How fees are staged
Most residential projects move through the same stages: feasibility and concept, design development, documentation for permits and tender, then contract administration while it's being built. Fees are usually split across those stages and invoiced as the work progresses.

In our case, once you've accepted the proposal you receive the client–architect agreement, an FAQ sheet and a mobilisation invoice, and then we book the briefing workshop. From there we invoice monthly, based on the percentage of work complete. Our standard agreement covers concept and design development. We'll already have given you a fee range for the later stages, but each gets its own agreement or a variation, so you're never committed to the whole journey on day one.
What "full service" means
Full service means we're with you from the first briefing workshop until the builder hands over the keys, and for a year after. For us that's seven stages:
- Concept design. Briefing, site analysis including a sun study, a few layout options, and an early estimate of building cost so the design and the budget start out together.
- Design development. The chosen option worked out in detail: materials, finishes, fittings and joinery, and bringing in the engineer and other consultants.
- Planning permit, if you need one. Preparing and lodging the application and dealing with council.
- Building permit and documentation. The full set of drawings and specification your builder prices from and builds from, coordinated with the engineer, energy rater and building surveyor.
- Choosing a builder. Preparing the tender package, comparing prices like for like, and helping you through to a signed building contract.
- Contract administration. Answering the builder's questions, visiting site and reporting in writing, checking the work against the drawings, assessing progress claims and variations before you pay them, and inspecting the house at completion.
- Handover. A house manual on how to live with the house through the seasons, closing out defects, and a check-in after twelve months.
Why it's worth considering
Most budget surprises on a build come from two places: drawings that leave too much open to interpretation, and a construction phase where nobody on your side is checking. Full service covers both. Detailed documentation means every builder prices the same thing, so quotes can be compared and there are fewer "that wasn't on the drawings" variations later. During construction, the contract is between you and the builder, and most people building for the first time don't know what a fair progress claim or variation looks like. Having the person who designed the house check the work and the invoices before you pay is a large part of what you're paying for.
Stages you might handle yourself
Full service isn't right for every project, and because each later stage is agreed separately, you can decide as you go. Some common ways people use an architect for part of the journey:
- Design and permits only. The architect designs the house and gets the planning permit, then a design-and-construct builder documents and builds it. It costs less, but the builder decides much of the detail, and their price is hard to compare with anyone else's.
- Finding your own builder. If you already have a builder you trust, you can skip the competitive tender and negotiate a price with them directly. I've explained how that works in Understanding Early Contractor Involvement and Negotiated Tenders. Either way, it's worth having someone check the quote and contract before you sign.
- Managing the build yourself. Contract administration is the stage people most often leave out. It saves fees, but you deal with the builder directly on questions, progress claims, variations and defects, which is where mistakes cost the most. I've written more about what an architect does during construction.
What full service costs with us
As a guide, our full-service fees, including GST, usually land between:
- A$25,000–A$50,000 for a small renovation
- A$50,000–A$100,000 for an extensive renovation and addition
- A$35,000–A$70,000 for a relatively simple new build
- A$55,000–A$120,000 for a more complex new build
These ranges cover all seven stages, including contract administration, which is billed monthly while your house is being built. An extensive renovation can cost more in fees than a simple new build because the existing house has to be measured, investigated and worked around, and it holds more surprises.
We use a fee calculator built on our historical baseline hours for each project type. It then increases the estimated time for each stage based on complexity factors like a heritage overlay, a sloping site, an existing house in poor condition, or a desire for high-end detailing and extensive custom joinery. That lets us estimate accurately how much work your project will need, and gives us the confidence to fix our fee.
What isn't in the architect's fee
This is where most budget surprises come from. Your architect's fee usually covers the architect's work, and that's it. You'll typically pay separately for:
- structural engineer (and civil or services engineers on bigger jobs)
- land surveyor for a feature and levels survey
- soil test (geotechnical report)
- energy rater for the energy rating your permit needs
- building surveyor, who issues the building permit
- quantity surveyor, if you want an independent cost estimate
- council and permit fees, plus the building levy, which is calculated on the final contract figure, so it can't be locked in at the start
- a heritage consultant, if an overlay calls for one
We coordinate these consultants, usually getting proposals and giving you a recommendation, but you engage and pay them directly. A good fee proposal lists them.
What a good fee proposal includes
Our fee proposals follow the same structure every time, and it's a useful checklist for comparing anyone's:
- Purpose: what the work is for, in a sentence or two.
- Staged scope and deliverables: what you get at the end of each stage.
- Fees by stage, with GST shown clearly.
- Assumptions, for example two or three possible design directions and two rounds of refinement.
- What counts as a variation, for example more than one full redesign, or a change to the brief after design is underway.
- Exclusions: everything above that isn't included.
- An indicative programme: roughly how long each stage takes.
- How long the offer is valid.
When you compare two proposals, compare the scope, not just the total. A cheaper fee that stops at planning drawings isn't cheaper than one that takes you through to a builder.
Watch the small things too. I've spoken with someone who wasn't told a 3D view of their bathroom would cost extra. Small, but exactly the kind of thing that should be written down as an exclusion or a variation before it happens.
The clause to read twice: when is a stage "complete"?
On one call this year, a homeowner told me her previous architect had classified the design as "95% complete", which moved the project into the next, larger fee stage.
I can't speak to that situation, but it's a good reminder to check how your agreement defines the end of each stage. When you've signed off the drawings? When they're lodged? Ask before you sign, and get the answer in writing. If you do end up unhappy with your architect, try to resolve it with them first; every registered architect in Victoria must have a complaints process. Ours is on our complaints handling page.
What we charge to get started
Many people don't need full service straight away. That's why our first steps are smaller, fixed and published:
- Clarity Consultation, A$1,200. A 90-minute, architect-led session on your home and your options, with a written summary and practical next steps. It's credited in full if you go on to The Big Picture.
- The Big Picture, A$8,500. A full masterplan: briefing, site analysis, testing layouts, and one preferred option drawn to scale, with a clear pathway into approvals and construction. Payment is staged, not upfront.
- Plan review, from A$495. For plans someone else has drawn: a briefing chat, the review, a debrief call and a written report, for a flat fee.
These options are on our Creating your home page. If you're not sure where you fit, start here.
If you're further along, ask us for a fixed-fee proposal. It sets out every stage and every exclusion in plain English, so you can see what you're paying for before you commit to anything.
Frequently asked questions
What percentage do architects charge in Australia? There's no official scale. Online guides quote anywhere from about 5% to 18% of construction cost, depending on the size of the project and how much of the work the architect does. Many architects, including us, quote fixed fees by stage instead, so you know the number upfront.
Is a fixed fee better than a percentage? A fixed fee gives you certainty: it doesn't rise if the construction cost does. A percentage is simpler to set up but grows with every upgrade or price increase. Either can be fair, as long as the scope and what counts as a variation are clearly written down.
What does "full service" mean? It means your architect takes you all the way from the first brief to handover: design, permits, choosing a builder, and looking after your side of the build while it's under construction. With us that's seven stages, from concept design to a check-in twelve months after you move in. Our first agreement covers concept and design development, and the later stages are agreed as you go.
Can I hire an architect for just part of a project? Yes. Common options are design and permits only, with a design-and-construct builder documenting and building it, or full documentation without contract administration during construction. Both save fees, but you take on more of the risk, especially once building starts. Smaller first steps, like a one-off consultation or a masterplan, are another way to start without committing to everything.
What isn't included in an architect's fee? Usually the other consultants (engineer, land surveyor, soil test, energy rater, building surveyor, quantity surveyor) plus council and permit fees and the building levy. Your architect can coordinate them, but you typically engage and pay them directly.
When do I pay my architect? Fees are usually split by stage and invoiced as the work progresses, sometimes with a mobilisation invoice at the start. We invoice monthly, based on the percentage of work complete, and bill contract administration at a monthly rate while your house is being built. Either way, you should approve each stage before your architect moves on to the next. In Victoria an architect can't charge you before a written, signed client–architect agreement is in place, and that agreement must say how and when fees are paid.
General information only, not legal or financial advice. Sources: ARBV, Victorian Architects Code of Professional Conduct, clause 6 and Working with an architect; Planning Victoria, Architects Regulations 2026; Airtasker, architect cost guide (percentage range). Prices for our services were current at publication.
The Sunday Section
One article like this, every Sunday.
Plain-language notes on renovating, building and buying, from a registered architect. No sales pitch, unsubscribe any time.
Circling one of these questions yourself? Write your brief →