Brunswick, Melbourne

Architect in Brunswick

Small lots, around fifty separate heritage precincts, and since March 2026 a new activity centre zone across most of Brunswick itself. Here's what that means if you want to renovate or extend in Brunswick, Brunswick East or Brunswick West.

Brunswick houses are mostly small and close together, and the brief is usually to make one work harder rather than get bigger. In a suburb this dense, a good renovation is usually a planning problem before it's a floor-area problem: where the light comes from, where the noise goes, and how two or three people do different things at once.

The rules have also just changed. Before you draw anything in Brunswick, it's worth knowing which of three quite different situations your house is in.

Brunswick homes we've designed

A Staged Renovation in Brunswick West — a two-bedroom Edwardian cottage, bought deliberately small and replanned for two people, one of whom works from home full time. The house is in a heritage overlay, so nothing changes at the street: the work is inside the existing walls, with a two-storey studio proposed off the rear laneway. The whole property is designed once and built in stages, so nothing has to be undone later.

What makes Brunswick different

The lots are small. Across Brunswick, Brunswick East and Brunswick West there are more than 15,000 residential lots, and about half of them are under 300 m². In Brunswick and Brunswick East it's more than half. Brunswick West has more room: about a third of its lots are that small. That line matters because under 300 m², extending a house needs a planning permit, whatever else applies.

Most of Brunswick is now an activity centre. At the end of March 2026 the State Government's controls for the Brunswick (Sydney Road) train and tram zone activity centre came into the Merri-bek Planning Scheme. About two in three residential lots in Brunswick itself are now in the new Housing Choice and Transport Zone. The state's plan allows up to four storeys in the inner catchment (six on blocks over 1,000 m²) and three in the outer catchment (four over 1,000 m²), with taller buildings in the core along Sydney Road.

For a house owner, two things follow. The rules for extending your own house are much the same as before, including the 300 m² line. But what can be built next door has changed, so the north light or the quiet backyard you're designing around may not stay that way. Good design here assumes the neighbours will change. Brunswick East has none of the new zone, and Brunswick West only a sliver (about 85 lots).

Heritage is a patchwork. Around fifty separate Heritage Overlay precincts touch the three suburbs, from the Blyth Street and Phillipstown precincts in Brunswick to the Daly Street and Grantham Street precincts in Brunswick West and Methven Park in Brunswick East. About a quarter of residential lots sit in one of them: roughly three in ten in Brunswick, and about one in five in Brunswick East and West. Some precincts cover only part of a street: the Tinning Street precinct, for example, is numbers 82–136 and 95–155. And a heritage overlay still applies inside the new activity centre zone: close to 1,900 lots in Brunswick are in both.

Merri-bek's heritage exemptions are narrow. Merri-bek grades every property in a precinct as significant, contributory or non-contributory, and its Moreland Heritage Exemptions Incorporated Plan 2023 sets out what each grade can do without a heritage permit. For a contributory property, the exemptions cover the small things:

  • an outbuilding in the rear setback, no more than 3 m high;
  • a verandah or pergola in the rear setback, if it isn't a corner block;
  • a deck no more than 800 mm above ground, and a pool in the rear setback no more than 1 m above ground;
  • side and rear fences in timber palings or corrugated iron, the same height as the existing fence and no more than 2 m, if it isn't a corner block;
  • a front fence up to 1.2 m;
  • rainwater tanks at least 2 m back from the front façade, and skylights at least 4 m back.

A single-storey addition is exempt only for a non-contributory property, and only if it's in the rear setback and no wider than the original house. Two-storey additions aren't exempt at all. So if your house is graded contributory or significant, plan on a planning permit for an extension. That's the situation in our Brunswick West project.

That's a real difference from some neighbouring councils. Maribyrnong, for example, exempts many single-storey rear additions in its heritage precincts (see our Yarraville page). In Merri-bek, the time to plan for is the permit.

Merri-bek City Council is the planning authority. It was the City of Moreland until 2022, which is why the exemptions plan and a lot of advice still online use the old name.

Other overlays worth checking before you design

  • Flood. About 800 residential lots are in a Special Building Overlay. Melbourne Water's version (SBO1) covers its drainage areas. Since 8 January 2026 a second one (SBO2) also maps overland flow in council's own drains, so some owners have only just found themselves in a flood overlay. If yours is, the flood level can set the floor level of an extension.
  • Moonee Ponds Creek. About 350 lots in Brunswick West are in the Significant Landscape Overlay for the creek corridor (SLO2). Works there need a permit unless the building is under 6 m high, adds no more than 50 m² of floor area, uses muted, low-reflective colours and materials, changes ground level by no more than 600 mm, and sits more than 50 m from the top of the creek bank. A smaller strip is in an Environmental Significance Overlay (ESO2).
  • Merri Creek. In Brunswick East, about 100 lots are in the Merri Creek Environmental Significance Overlay (ESO1), and a smaller number in the creek's Significant Landscape Overlay (SLO3). Under ESO1, a building in a residential zone generally doesn't need a permit if it's no more than 6 m high, with foundations less than a metre deep.

Do you need a planning permit to extend in Brunswick?

On a lot of 300 m² or more, extending a single house generally doesn't need a planning permit under the zone, and that's as true in the new Housing Choice and Transport Zone as in the Neighbourhood Residential Zone. Setbacks, overshadowing and overlooking are checked through the building permit instead. Under 300 m², a permit is needed, though since September 2025 a compliant design can often use the ten-day VicSmart process.

Then the overlays decide the rest. In Brunswick the order that usually matters is: lot size, heritage precinct and your property's grading, then flood and the creek corridors.

Our free planning permit check and heritage overlay check read the State Government's live planning data for any Victorian address. Use them to find out which of these questions apply to your house before you start designing.

Studios and small second homes

Where a block backs onto a laneway, a small building at the back can work well. In the Brunswick West project it's a two-storey studio off the lane: a gym and workshop below, a home office and spare room above. Since late 2023 a self-contained small second dwelling of up to 60 m² can be built without a planning permit on many residential lots. In Brunswick, two things often get in the way: on a lot under 300 m² the zone requires a permit for one, and in a heritage precinct the outbuilding exemption stops at 3 m high, which rules out anything with an upstairs.

The trap worth avoiding

Designing for the house you have now and the neighbours you have now. In a suburb whose planning controls have just been rewritten, a living room that depends on sun over the side fence is a gamble. The safer moves are light from above (skylights, clerestories, a raised section of roof over the middle of the plan) and outdoor space oriented so that it still works if the house next door goes up a storey or two.

The other trap is renovating in instalments with no plan. Small houses get added to piecemeal, and each piece blocks the next. Designing the whole property once and then building it in stages, as in the Brunswick West project, means nothing has to be undone later.

How we'd start

A conversation, unhurried and free, about the house and what's been holding you up. You can also write your brief first — ten questions, and you'll have a written brief to bring to that conversation. Then an honest read on whether the idea is sound, including whether your lot is inside the new activity centre zone and how your property is graded if it's in a precinct.

If it's promising, a Clarity Consultation gives you a focused architect-led session on your options. The Big Picture is the full masterplan. Neither starts with a sales pitch.

If you haven't bought yet, Confidence to Buy gives you an architect's read on each house you're serious about: what it could become, what that would cost, and what would stop you.

Further reading

How to plan a home that works now and later is the thinking behind designing once and building in stages. Do I need a planning permit for an extension in Victoria? explains the state-wide rules behind the 300 m² line.

We also work nearby in Coburg, and across Melbourne's inner west in Yarraville, Newport and Williamstown.

Where these numbers come from: lot counts are ours, from Vicmap Property and the State Government's planning scheme zone and overlay maps (October 2026), covering lots in the Neighbourhood Residential, General Residential and Housing Choice and Transport Zones of Brunswick, Brunswick East and Brunswick West, with stacked apartment titles counted once. The exemption details are from the Moreland Heritage Exemptions Incorporated Plan 2023. The activity centre heights are from the State Government's Brunswick activity centre page. Check your own address before relying on any of it.